Leave Your Message
Summary of Floating Dock Platform Information
Engineering case
News Categories
Featured News

Summary of Floating Dock Platform Information

2025-12-23

2. Mind Map

3. Detailed Summary

I. Basic Document Information

  1. Compiling Entity: Hubei Muchu Water Conservancy and Hydropower Planning, Surveying, Design and Research Co., Ltd., which holds a Class B design qualification with the design certificate number Class B AI42007363.
  2. Document Nature: It includes two core contents: the Floating Dock plan and the floating dock platform data sheet. The drawing time is marked as September 2024, and the scale information is not specified.

II. Personnel Division of Labor Information

Responsibility Name Remarks
Design Yang Mingwu, Wang Jianxun, Zhou Huanming Multiple personnel participate in the design work, with no detailed division of labor specified
Drawing Wang Li Clearly marked as the person responsible for drawing
Tracing Not mentioned No tracing personnel information is recorded in the document

III. Detailed Parameters of Floating Dock Platform Components

The table below fully presents key technical information such as component names, quantities, specifications, dimensions and materials:
Serial Number Component Name Quantity Specification & Dimension Material Remarks
1 Floating Buoy 951 pieces 505040cm High-molecular Polyethylene Core load-bearing component with the largest quantity
2 Railing (Model B) 116 pieces Not specified High-molecular Polyethylene Protective component for platform safety
3 Steel Pipe Column 17 sets DN229+3 Steel Pipe Main supporting structure of the platform
4 General Column 92 sets Not specified High-density Polyethylene Matching Floating Buoys Auxiliary component for floating buoy installation
5 Holder 17 sets Not specified Hook Structure Hot-dip Galvanized Square Pipe Device for component fixing
6 Steel Structure Platform 1 item Not specified Not specified Core operating platform of the dock, parameters to be supplemented
7 Aluminum Alloy Approach Bridge 1 set 15*3.0m Aluminum Alloy Channel component connecting the dock to the shore

4. Key Questions

Question 1: What is the core load-bearing component of this floating dock platform? What are its specific specifications, quantity and material?

Answer: The core load-bearing component is the floating buoy; its specific parameters are 951 pieces in quantity, 505040cm in specification, and high-molecular polyethylene in material. This component has the largest quantity and is the foundation for the dock platform to realize the floating function.

Question 2: What kind of design qualification does the compiling unit of the documents related to this floating dock have? What is the drawing time of the document and who are the key persons in charge (e.g., drawer)?

Answer: The compiling unit is Hubei Muchu Water Conservancy and Hydropower Planning, Surveying, Design and Research Co., Ltd., which holds a Class B design qualification (Design Certificate No.: Class B AI42007363); the document drawing time is September 2024; the key person in charge is Wang Li (drawer), and the designers include Yang Mingwu, Wang Jianxun and Zhou Huanming.

Question 3: What are the key supporting and connecting components in this floating dock platform? What are their corresponding quantities and materials?

Answer: The key supporting and connecting components and their parameters are as follows: ① Steel Pipe Columns (supporting components): 17 sets, made of DN229+3 steel pipes; ② Aluminum Alloy Approach Bridges (connecting components): 1 set, made of aluminum alloy, with a specification of 15*3.0m; ③ Holders (fixed connecting components): 17 sets, made of hook structure hot-dip galvanized square pipes.